New Campus Development - Development Progress

New Campus Development - Development Progress

HKMU's Proposed New Campus

A Hub for Community Health and Wellness

Milestones and Progress Logs

January 2021
Feasibility Study
  • Identification of Sheung Shing Street Slope Site as potential new campus.
  • Commencement of Technical Feasibility Study.

January 2021
October 2021
Submission of Tentative Development Plan to Education Bureau
  • Submission of tentative development plan and technical feasibility report to Education Bureau (EDB).
  • Obtained support from EDB on the planning application for the proposed new campus development.
October 2021
June 2022
Consultation with District Council
  • Meeting with Kowloon City District Council Social Services Committee to explain the development.
June 2022
August 2022
Commencement of Public Consultation
  • Carry out public consultation activities and engage with local organizations.
  • Roadshow and Questionaries activities for the nearby community.

August 2022
June 2023
Submission of Pre-Circulation Planning Application
  • Submission of Section 16 pre-circulation documents to Planning Department and Government departments.

June 2023
September 2023
Submission of Formal Planning Application
  • Formal Section 16 Application to Town Planning Board has been submitted on 29 September 2023.
September 2023
Jan 2024
Application for Land Grant
  • Apply for Land Grant from the Lands Department after Town Planning Board approves the Section 16 planning application.
Jan 2024
Jul 2024
Appointment of Consultant Team
  • Following the university's selection process, Rocco Design Architects Associates Ltd was appointed as the Architect for this project.
Jul 2024
July 2024
Commencement of Design Stage
  • Carry out conceptual design and feasibility study on design options.
  • Conduct detailed design and tender preparation of the project.

July 2024
May 2025 (Planned)
Commencement of Foundation Works
  • Site preparation works and formation of retaining structure.
  • Piling works and construction of foundation structure.

May 2025 (Planned)
September 2026 (Planned)
Commencement of Superstructure Works
  • Construction work of the basement and main building.
  • MEP and Interior fit-out installation.

September 2026 (Planned)
Aug 2028 (Planned)
In Operation
  • Completion of new campus development and ready to use.
Aug 2028 (Planned)